View Our Website View All Jobs

Junior Project Scheduler

Job Summary:
This position is responsible for performing integrated project control scheduling functions for the successful implementation of Nuclear projects.  In this capacity the individual must understand the Enterprise Project Work Breakdown Structures and their applicability and integration within the Schedule.

Primary Duties and Responsibilities:

Work collaboratively with Project Managers to establish and maintain project schedule baseline and updates.
Analyzes and interprets data submitted by Project Manager to formulate critical path plan and schedules using Primavera 6.0 scheduling tool.
Monitors critical path and prepares schedule analysis to identify impact of progress and / or scope change on previously scheduled target dates. Recommend corrective action to Project Manager as required.
Understands how to apply a standard project’s work breakdown structure and schedule template to a wide variety of projects.
Incorporate engineering inputs and progress to the schedule.
Provide schedule input for routine Project Status Reports used to calculate analyze performance and report results.
Identify and propose process improvements to optimize work flow and assure on time completion
Professionally communicate with management orally and in writing.

Knowledge:

Demonstrated knowledge of Primavera project scheduling tool.
Demonstrated knowledge of Project Management practices.
Knowledge of Project Engineering practices and processes.
Knowledge of Project Construction Management.
Knowledge of either Nuclear Power Plant or Fossil plant operations is desirable but not necessary.

Skills/Abilities:

Expertise with Project Scheduling Software (e.g. Primavera, MS Project) a plus.
Proficiency in the use of  MS Office applications
Demonstrated ability to detect, analyze, and investigate project schedule anomalies.
Demonstrated ability to provide appropriate corrective actions for project scheduling issues.

Education/Experience:

Bachelors / Associates degree in Engineering or other equivalent technical degree.
0 – 2 Years Experience Desired.

Read More

Apply for this position

Required*
Apply with Indeed
Attach resume as .pdf, .doc, or .docx (limit 2MB) or Paste resume

Paste your resume here or Attach resume file

150